Potholing Service for the Carpinteria Advanced Purification Project:

PUBLIC NOTICE IS HEREBY GIVEN that the CARPINTERIA VALLEY WATER DISTRICT (CVWD), invites sealed bids for POTHOLING SERVICES FOR THE CARPINTERIA ADVANCED PURIFICATION PROJECT (Project or Work) and will receive such bids by email to Brian@cvwd.net up to the hour of 2:00 pm, on December 7, 2023. The Board intends to solicit proposals or bids from contractors qualified to perform the necessary Work and satisfactorily and timely complete the Project, and to make an award to the lowest responsible, responsive proposer.

As part of the Carpinteria Advanced Purification Project (CAPP), a water transmission main is currently being designed and will be constructed. It will convey purified water from an advanced water purification facility to injection wells, in the City of Carpinteria, CA. CVWD has directed, with these documents, potholing at strategic locations along the proposed pipeline alignment to inform the pipeline design.

The work includes obtaining encroachment permit(s) from the City of Carpinteria, creation and implementation of a traffic control plans, potholing utilities in paved areas in the public right-of-way, documenting location, depth, and other pertinent information of underground utilities, backfilling, and restoring pavement. The project duration is limited to 30 working days.

To view and download the bid package and addendum, click on the links below.

 

Potholing Services for the Carpinteria Advanced Purification Project

 

Questions regarding the Bid and Contract Documents content should be directed to Chris Malejan at
cmalejan@wsc-inc.com and Brian King at Brian@cvwd.net.

Public Works Contractor Registration Notice: No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the California Department of Industrial Relations pursuant to Labor Code section 1725.5.

Bidders (and their subcontractors listed on the Designation of Subcontractors List) must provide an extract (pdf) with bid showing active registration. To obtain an extract go to: https://efiling.dir.ca.gov/PWCR/.

Projects

El Carro Well Monitoring Project

El Carro Well Monitoring Project: CVWD is drilling groundwater monitoring wells to examine groundwater elevations and water quality. This project will benefit CVWD and our customers by providing information that will allow the District to appropriately manage groundwater resources. The well will be incorporated into the Carpinteria Groundwater Management Plan. Funding for the project is administered by the California Department of Water Resources and financed under the California Drought, Water, Parks, Climate, Coastal Protection and Outdoor Access for All Act of 2018 (Proposition 68).

The proposed schedule of the project is from July through early September 2023.

For additional information about the project, contact CVWD District Engineer, Brian King at 805-684-2816 ext. 107 or brian@cvwd.net